Skip to quote form
Filing now in all 48 contiguous states · 8am–8pm ET, 7 days
NY

New York oversize permit rules

What New York charges for a single-trip OS/OW permit, the limits that trigger one, and the escort thresholds — read from the state’s own publication. This rule has been in effect since 2014-02-01.

Oversize permit

$40

One price for a single-trip permit, whatever the dimensions. A 9-foot-wide load and a 16-foot-wide load pay the same.

Overweight permit

$40

One price for a single-trip overweight permit.

A load that is both oversize and overweight pays this fee only, not both.

+ $20 Permigo service fee per permit, state fees at cost.

Legal limits

Exceed any one of these in New York and you need a permit for this state.

LimitInterstate
Width8'6"
Height13'6"
Length65'0"
Gross weight80,000 lbs
Single axle22,400 lbs
Tandem axle36,000 lbs
Trailer length53'0"

What the permit costs

New York prices a single-trip permit as flat rate. One price for a single-trip permit, whatever the dimensions. A 9-foot-wide load and a 16-foot-wide load pay the same.

Escort requirements

Thresholds by road class. Where two classes differ, the road you are actually on governs.

4+ lane (divided)

WidthRequirement
Over 12'0"1 rear escortGreater than 12' wide on four-lane or divided highways: FOLLOWED by a certified escort (17 NYCRR 154-1.8(b) verbatim). No 14' general step (the old F+R band was the mobile-home rule — removed).Rush-hour bans 7–9 a.m. + 4–6 p.m.: STATEWIDE for loads ≥16' wide, ≥100' long, or ≥14' high (Manual §IV.2(c)/§V(B)1); in BUSINESS DISTRICTS for ~≥14' wide / ≥90' long / ≥14' high (§IV.2(b)); city-specific: Binghamton >10'w or >72'l; 10-mi radius of Syracuse >10'w or >85'l; Hudson/Kingston/Newburgh/Poughkeepsie >11'w; Utica/Amsterdam >12'w + police contact (§V(B)3).
Over 16'0"1 police escort · route survey · superloadOver 16' wide: NYSP escort ('exceeds 16 feet in width' — any road type) + Type 1S SUPERLOAD + $10,000 width bond + route survey. The THIRD-escort step on four-lane highways starts at 18' (next band).
18'0" and over2 front escorts + 1 rear escort18' wide OR GREATER on four-lane highways: three certified escorts — two front, one rear (Manual §V(A)15(e) verbatim '18 feet wide or greater on four-lane highways').
HeightRequirement
14'0" and over1 front escort · height pole · route survey14' or greater in height: a FRONT certified escort carrying the height pole — set 3" above load height (6" when also >12' wide) — Manual §V(A)15(b); 154-1.12(c)(10) 'every front escort shall have a measuring device … when escorting an overheight load' (the pole rides THE escort — one vehicle, now BILLED; the old heightPole-without-vehicle under-billed two-lane overheight moves). PLUS a physical ROUTE SURVEY: 'the Department requires a physical route survey for all vehicles at or over 14'-0" high' (SHN 08-02) — performed and certified by a NY certified escort (PERM 85), valid 30 days. The Manual
16'0" and over1 police escort · superload16' or greater in height: Type 1S SUPERLOAD (PERM 12S 'at or greater than 16 feet in height') + NYSP ('height of the vehicle/load is 16 feet or greater') + surety bond $10,000 (≥16'<17') or $30,000 (≥17'), additive with other bond tiers; ≥15' high may require a signal-contractor bucket truck; ≥14' utility-wire remediation documented in the route survey.
LengthRequirement
80'0" and over1 rear escort80' or greater on four-lane/divided highways: FOLLOWED by a certified escort (Manual 15(c)). The old ≥100' front+rear step on multilane was the THRUWAY's rule leaking into the state tier (removed — it lives in the NYTP authority entry); NYSDOT's next step is 160'.
100'0" and overroute survey100' or greater: physical route survey required ('at or over … 100'-0" long' — SHN 08-02, certified-escort-performed, valid 30 days). No extra escort step on state four-lane roads until 160'.
160'0" and over2 front escorts + 1 rear escort · 1 police escort · route survey · superload160' or greater on four-lane highways: THREE certified escorts (two front, one rear — Manual 15(e); ONLY TWO if traveling interstate-only,)
Front overhangRequirement
10'0" and over1 rear escortOverhang of 10' or more: escort positioned BY ROAD TYPE — rear on four-lane/divided (position follows the road, not the overhang end).
Rear overhangRequirement
10'0" and over1 rear escortOverhang of 10' or more: escort positioned BY ROAD TYPE — rear on four-lane/divided (position follows the road, not the overhang end).
WeightRequirement
200,000 lbs and over1 police escort · route survey · superload200,000 lb or greater: Type 1S SUPERLOAD (PERM 12S) + NYSP ('exceeds 200,000 pounds or the vehicle must cross the centerline of a structure') + additive surety bond: $10,000 (≥200k<300k) / $20,000 (≥300k<400k) / $50,000 (≥400k); any bridge-analysis engineering is retained by the permittee at their cost; NYSP arrangements ≥2 business days ahead; manufacturer non-divisibility certification + municipality permission letters per PERM 12S.

2/3 lane (undivided)

WidthRequirement
Over 12'0"1 front escortGreater than 12' wide on other-than-four-lane/divided highways: PRECEDED by a certified escort (17 NYCRR 154-1.8(b) verbatim). No general 14' width escort step exists — the old front+rear-at->14' band was the MOBILE/MODULAR-HOME rule (154-1.11(b)(4)) leaking into general freight (removed 2026-07-13); a wide-AND-long load takes 2 escorts when both single-escort rules apply (Manual §V(A)15(d)).Rush-hour bans 7–9 a.m. + 4–6 p.m.: STATEWIDE for loads ≥16' wide, ≥100' long, or ≥14' high (Manual §IV.2(c)/§V(B)1); in BUSINESS DISTRICTS for ~≥14' wide / ≥90' long / ≥14' high (§IV.2(b)); city-specific: Binghamton >10'w or >72'l; 10-mi radius of Syracuse >10'w or >85'l; Hudson/Kingston/Newburgh/Poughkeepsie >11'w; Utica/Amsterdam >12'w + police contact (§V(B)3).
Over 16'0"2 front escorts + 1 rear escort · 1 police escort · route survey · superloadOver 16' wide on two-lane highways: THREE certified escorts (two front, one rear — Manual §V(A)15(e)) + New York State Police ('Vehicle/load exceeds 16 feet in width', §V(A)18(b)); >16' wide is also Type 1S SUPERLOAD (PERM 12S 'exceed 16 feet in width') with the additive surety bond (PERM 14: $10,000 for width) and a physical route survey (≥16' wide — SHN 08-02, certified-escort-performed, valid 30 days). ≥18' wide may additionally need a PE-stamped traffic control plan.
HeightRequirement
14'0" and over1 front escort · height pole · route survey14' or greater in height: a FRONT certified escort carrying the height pole — set 3" above load height (6" when also >12' wide) — Manual §V(A)15(b); 154-1.12(c)(10) 'every front escort shall have a measuring device … when escorting an overheight load' (the pole rides THE escort — one vehicle, now BILLED; the old heightPole-without-vehicle under-billed two-lane overheight moves). PLUS a physical ROUTE SURVEY: 'the Department requires a physical route survey for all vehicles at or over 14'-0" high' (SHN 08-02) — performed and certified by a NY certified escort (PERM 85), valid 30 days. The Manual
16'0" and over1 police escort · superload16' or greater in height: Type 1S SUPERLOAD (PERM 12S 'at or greater than 16 feet in height') + NYSP ('height of the vehicle/load is 16 feet or greater') + surety bond $10,000 (≥16'<17') or $30,000 (≥17'), additive with other bond tiers; ≥15' high may require a signal-contractor bucket truck; ≥14' utility-wire remediation documented in the route survey.
LengthRequirement
80'0" and over1 front escort80' or greater on other-than-four-lane/divided highways: PRECEDED by a certified escort (154-1.8(c) verbatim 'vehicles over 80 feet in length shall be preceded';
100'0" and over2 front escorts + 1 rear escort · route survey100' or greater on two-lane highways: THREE certified escorts — TWO FRONT, one rear (Manual §V(A)15(e) verbatim;)
160'0" and over1 police escort · route survey · superload160' or greater: Type 1S SUPERLOAD (PERM 12S 'at or greater than 160 feet') + NYSP ('exceeds 160 feet in length' — the Manual's police list; 200' is the THRUWAY's police line, not NYSDOT's) + $10,000 length bond. Note the knife-edge: PERM 12S says 'at or greater' while the superloads page says 'greater than
Front overhangRequirement
10'0" and over1 front escortOverhang of 10' or more (154-1.12; the Manual says 'greater than 10 feet' — inclusive kept): escort positioned BY ROAD TYPE — front on two-lane
Rear overhangRequirement
10'0" and over1 front escortOverhang of 10' or more (154-1.12; the Manual says 'greater than 10 feet' — inclusive kept): escort positioned BY ROAD TYPE — front on two-lane
WeightRequirement
200,000 lbs and over1 police escort · route survey · superload200,000 lb or greater: Type 1S SUPERLOAD (PERM 12S) + NYSP ('exceeds 200,000 pounds or the vehicle must cross the centerline of a structure') + additive surety bond: $10,000 (≥200k<300k) / $20,000 (≥300k<400k) / $50,000 (≥400k); any bridge-analysis engineering is retained by the permittee at their cost; NYSP arrangements ≥2 business days ahead; manufacturer non-divisibility certification + municipality permission letters per PERM 12S.

Movement restrictions

RestrictionIn New York
Night travelDaylight hours only
WeekendsRestricted
HolidaysRestricted

Movement hours

SituationWindow
General OSdaylight (½ hr after sunrise-side bounds), Mon–Fri only — no Saturdays, Sundays, or the 6 holidays; PLUS no movement from noon the weekday before Memorial/July 4/Labor/Thanksgiving/Christmas (154-1.2(a))
Saturday exception≤12′ wide AND ≤85′ long at traffic-flow speed: allowed until 12:00 noon Saturday (unless a holiday/day-preceding)
OW-only ≤125% legal weightNO time or day restrictions at all (not overdimensional, flow speed — 154-1.2(a))
Rush bans 7–9 a.m. + 4–6 p.m.statewide: ≥16′w / ≥100′l / ≥14′h; business districts: ~≥14′w / ≥90′l / ≥14′h; city rules: Binghamton >10′w·>72′l · Syracuse 10-mi >10′w·>85′l · Hudson/Kingston/Newburgh/Poughkeepsie >11′w · Utica/Amsterdam >12′w
Night travelby request only, in Westchester · Rockland · Dutchess · Putnam · Orange · Nassau · Suffolk
Mobile/modular >14′ wideMon–Thu 9–3, Fri 9–noon; + MLK, Lincoln's, Washington's, Columbus Monday holidays restricted
Weather / speedno travel under 1,000′ visibility or hazardous surface; max 55 mph unless permit states otherwise
Validitysingle trip = up to 5 permissible hauling days, round trip same load OK; route survey valid 30 days
NYC / Thruwayseparate regimes — NYC $35 per leg with 48-hr lead and tighter legals; Thruway permits via HOOCS with its own escort/police ladder

Where these permits come from

If you file yourself, this is the office you are dealing with. Check the linked page — some states issue OS/OW permits through their highway patrol or revenue department rather than the DOT.

New York permit office
Permit office888-783-1685 ext 2
Filing notesPortal HOOCS: hoocs.dot.ny.gov (OSCAR / NY.gov ID; escrow or card; 1 DAY from permit start date to pay; USDOT accounts self-issue qualifying permits)

VTL §385 (nysenate.gov + NYSDOT-hosted copy, am. 3/25/2022 · dot.ny.gov · in effect since 2014-02-01. Fees and rules change; the linked document is always the authority.